You are here: Using The System > Menu Navigation > Tools > Schedule Viewer

Schedule Viewer

The Schedule Viewer is used for an at-a-glance view of the Schedules of all Objects in the property. To access the Schedule Viewer:

The days of the week and times are shown along the top of the screen. Objects that can be controlled by a Schedule are shown on the left-hand side. 'No Schedule Attached' is displayed when an Object has not been assigned a Schedule. To assign a Schedule, exit the Schedule Viewer and go to Edit | Schedule Settings.

The example below shows a combination of on/off Schedules and temperature Schedules.

Schedule Viewer Key

The Schedule Viewer window

WEMS User Guide version 4.0 20150130.
This guide relates to features up to and including 1.18.0.3